Swinburne
Browse

Removing hidden waiting time in critical path schedules: a location-based approach to avoiding waste

Download (1.08 MB)
conference contribution
posted on 2024-07-09, 21:57 authored by Russell Kenley, Toby Harfield
Production waste from non-productive activities is a well understood concept in Lean Construction Management. Waiting-time is also a well understood form of production waste. However, waste arising from the hidden waiting-time inherent in poorly designed CPM schedules has not previously been described. Hidden waiting-time is defined and demonstrated using location-based visualisation methods for construction cycles. A construction cycle refers to a repetitive sequence of work required to erect a structure. Two case studies illustrate how such waiting time can be removed and replaced by production buffers using appropriate levels of location breakdown. What sort of waste is represented by the time reduction demonstrated in these case studies? The TFV based taxonomy of wastes includes both inefficient waste and waiting time, but combining the two to define hidden waste found in CPM schedules, requires a new category. Cycle waiting time is the waste of not planning the most efficient project structural cycle and therefore not being able to identify hidden wastes based on utilisation of location based structure.

Funding

The Role of Cytokinins and Gibberellins in Juvenility in Douglas-Fir

Directorate for Biological Sciences

Find out more...

History

Available versions

PDF (Published version)

ISBN

9780987455796

Journal title

Proceedings of IGLC 23 - 23rd Annual Conference of the International Group for Lean Construction: Global Knowledge - Global Solutions Volume 2015

Conference name

23rd Annual Conference of the International Group for Lean Construction, IGLC 2015

Location

Perth

Start date

2015-07-28

End date

2015-07-31

Volume

2015-January

Pagination

7 pp

Publisher

International Group for Lean Construction

Copyright statement

Copyright © 2015. This work is reproduced in good faith. Every reasonable effort has been made to trace the copyright owner. For more information please contact researchbank@swin.edu.au.

Language

eng

Usage metrics

    Publications

    Categories

    No categories selected

    Keywords

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC