Resource unconstrained and constrained project scheduling problems and practices in a multiproject environment

Download (1.55 MB)
journal contribution
posted on 2024-07-11, 10:45 authored by Marimuthu Kannimuthu, Palaneeswaran EkambaramPalaneeswaran Ekambaram, Benny Raphael, Ananthanarayanan Kuppuswamy
Construction companies execute many projects simultaneously. In such situations, the performance of one project may influence the others positively or negatively. Construction professionals face difficulties in managing multiple projects in limited resource situations. (e purpose of this study is to identify the problems in multiproject scheduling from the practitioner’s perspective and to discover current practices under resource unconstrained and constrained settings. (e specific objectives are (1) determining the most challenging issues being faced in handling multiproject environment, (2) enumerating the practices adopted in the industry, and finally (3) identifying the practitioners’ perceptions on the multiproject scheduling aspects such as network modeling approaches; activity execution modes; concept of sharing, dedicating, and substituting resources; centralized and decentralized decision-making models; solution approaches; and tools and techniques. An online questionnaire survey was conducted to address the objectives above.(e top challenging issues in managing multiproject environment are identified. Factor analysis identified the factors by grouping the variables (a) decision-related, (b) project environment-related, (c) project management-related, and (d) organization-related factors. Resource-unconstrained situation mainly faces the issue of underutilization and wastage of resources leading to lower profit realization. (e following findings were identified to overcome the unconstrained resource situation such as identifying the work front, adopting pull planning approach, creating a common resource pool, and allotting it on a rental basis. On the contrary, resource-constrained situation faces the issues of prioritization of resources, coordination, communication, collaboration, quality issues, and rework. (e findings suggest the strategies such as topup via subcontracting, proactive pull planning, introducing buffers, training the culture of the organization towards better communication, coordination, and collaboration, to improve the reliability of achieving baseline project performances. Various multiproject aspects suggested for effective management. (e identified problems, practices, and various multiproject aspects are expected to contribute better management of multiproject resource unconstrained and constrained project scheduling.

Funding

Ministry of Education

History

Available versions

PDF (Published version)

ISSN

1687-8086

Journal title

Advances in Civil Engineering

Volume

2018

Article number

article no. 9579273

Pagination

1-13

Publisher

Hindawi Limited

Copyright statement

Copyright © 2018 Marimuthu Kannimuthu et al. (is is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Language

eng

Usage metrics

    Publications

    Categories

    No categories selected

    Keywords

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC